91 pointWhen preparing advanced production scheduling (APS) system time estimates, it is desirable…

Written by

in

➤ How does overstating operation times in APS affect key manufacturing metrics?
Overstated times typically increase work-in-process, raise lead times, lower throughput, and decrease equipment utilization. It can improve on-time delivery superficially but masks inefficiencies and delays continuous improvement. Accurate metrics and controlled buffers provide better visibility and operational performance than uniform padding.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *